2 Orchehill Rise, Chalfont St Peter

Construction of 2 high specification detached executive houses.
The scheme had precast concrete first floor incorporating hidden steelwork within the depth of the floors.
David French Partnership carried out the ground investigation and full engineering design of the property

24 Reynolds Road, Beaconsfield

Construction of high specification executive house.
The scheme had attic trusses for the roof with precast concrete first floor incorporating hidden steelwork within the depth of the floors.
David French Partnership carried out the ground investigation and full engineering design of the property

27 Windsor Road, Gerrards Cross

Construction of 2 high specification detached executive houses.
The scheme had precast concrete first floor incorporating hidden steelwork within the depth of the floors.
David French Partnership carried out the ground investigation and full engineering design of the property

The Old Rectory, Orsett

Construction of 12, high specification 2 bedroom flats and a large detached car port.
David French Partnership carried out the ground investigation and full civil and structural engineering design of the buildings, including roads and drainage.

The area was surrounded with trees and DFP had to design tree protection measures on the roads and paved areas

High Storrs, Maltmans Lane, Gerrards Cross

Large 3 storey replacement detached house with attached multi-car garage and swimming pool.